Pipeline Maintenance Level 2 Trainee Guide, 3rd edition
CT52_2-17 Conduct a Leak Survey with a CGD (Subscription)
ISBN-13: 9780134808543
What's included
Overview
This is the eBook of the printed book and may not include any media, website access codes, or print supplements that may come packaged with the bound book.
This exceptionally produced trainee guide features a highly illustrated design, technical hints and tips from industry experts, review questions and a whole lot more! Key content includes:
CT15_1-17 Visually Inspect Surface Conditions of Right-of-Way
CT16_1-17 Inspect Navigable Waterway Crossing
CT27_1-17 Routine Inspection of Breakout Tanks (API 653 monthly or DOT annual)
CT28_0-17 Provide Security for Pipeline Facilities
CT34_0-17 Inspect Existing Pipe Following Movement
CT37_0-17 Install or Repair Support Structures on Existing Above Ground Components
CT38_1-17 Visually Inspect Pipe and Pipe Components Prior to Installation
CT39_0-17 Backfilling a Trench Following Maintenance
CT52_1-17 Conduct Vegetation Survey
CT52_2-17 Conduct a Leak Survey with a CGD
CT52_3-17 Conduct a Leak Survey with a Flame Ionization Unit
CT59_0-17 Vault Maintenance (Gas)
CTCC-17 Cold Cutting
CTFB-17 Flange Bolting
CTMP-17 Mud Plugging
CTTB-17 Tubing
CTTP-17 Threaded Pipe Fabrication
Instructor Supplements
Instructors: Product supplements may be ordered via our ordering department at 1-800-922-0579 or directly through OASIS at http://oasis.pearson.com.
Instructor Access Card Provides access to PowerPoints, Lesson Plans and Performance Profile sheets
Instructor's Resource Card ISBN: 9780134716558
Price $100
Table of contents
CT15_1-17 Visually Inspect Surface Conditions of Right-of-Way
CT16_1-17 Inspect Navigable Waterway Crossing
CT27_1-17 Routine Inspection of Breakout Tanks (API 653 monthly or DOT annual)
CT28_0-17 Provide Security for Pipeline Facilities
CT34_0-17 Inspect Existing Pipe Following Movement
CT37_0-17 Install or Repair Support Structures on Existing Above Ground Components
CT38_1-17 Visually Inspect Pipe and Pipe Components Prior to Installation
CT39_0-17 Backfilling a Trench Following Maintenance
CT52_1-17 Conduct Vegetation Survey
CT52_2-17 Conduct a Leak Survey with a CGD
CT52_3-17 Conduct a Leak Survey with a Flame Ionization Unit
CT59_0-17 Vault Maintenance (Gas)
CTCC-17 Cold Cutting
CTFB-17 Flange Bolting
CTMP-17 Mud Plugging
CTTB-17 Tubing
CTTP-17 Threaded Pipe Fabrication
For teachers
All the material you need to teach your courses.
Discover teaching materialPublished by Pearson (May 22nd 2017) - Copyright © 2018