Table of contents
- 1. A Review of General Chemistry(0)
- Orgo 1: Pre-Course Review(0)
- What is Organic Chemistry?(0)
- Atomic Structure(0)
- Wave Function(0)
- Molecular Orbitals(0)
- Sigma and Pi Bonds(0)
- Octet Rule(0)
- Bonding Preferences(0)
- Formal Charges(0)
- Skeletal Structure(0)
- Lewis Structure(0)
- Condensed Structural Formula(0)
- Index of Hydrogen Deficiency (Structural)(0)
- Constitutional Isomers(0)
- Resonance Structures(0)
- Hybridization(0)
- Molecular Geometry(0)
- Electronegativity(0)
- 2. Molecular Representations(0)
- 3. Acids and Bases(0)
- 4. Alkanes and Cycloalkanes(0)
- Alkane Nomenclature(0)
- Common Substituents(0)
- Cycloalkanes(0)
- Bicyclics(0)
- Alkyl Halides(0)
- Alkenes, Alkynes and Alcohols(0)
- Naming Alcohols(0)
- Naming Amines(0)
- Cis vs Trans(0)
- Conformations(0)
- Newman Projections – Conformational Energy(0)
- Newman Projections – Method(0)
- Barrier To Rotation(0)
- Heat of Combustion(0)
- Cyclohexane – Chairs and Positions(0)
- Cyclohexane – Determination of Cis and Trans(0)
- Equatorial Preference(0)
- Chair Flip(0)
- Calculating Flip Energy(0)
- A-Values(0)
- Decalin(0)
- 5. Chirality(0)
- Types of Isomers(0)
- Chirality(0)
- Chirality Test 1 - Internal Line of Symmetry(0)
- Chirality Test 2 - Stereocenters(0)
- Cahn-Ingold-Prelog Nomenclature(0)
- Types of Stereoisomers(0)
- Atropisomers(0)
- Meso Compounds(0)
- Chirality Test 3 - Disubstituted Cycloalkanes Shortcuts(0)
- Isometric Relationships(0)
- Fischer Projection(0)
- Fischer Configurations(0)
- Optical Activity(0)
- Enantiomeric Excess(0)
- Calculations with Enantiomeric Percentages(0)
- Non-Carbon Chiral Centers(0)
- 6. Thermodynamics and Kinetics(0)
- 7. Substitution Reactions(0)
- 8. Elimination Reactions(0)
- 9. Alkenes and Alkynes(0)
- 10. Addition Reactions(0)
- General Mechanism – Addition Reaction(0)
- Markovnikov's Rule(0)
- Hydrohalogenation(0)
- Acid-Catalyzed Hydration(0)
- Oxymercuration-Reduction(0)
- Hydroboration-Oxidation(0)
- Catalytic Hydrogenation and Wilkinson's Catalyst(0)
- Halogenation(0)
- Halohydrin Formation(0)
- Cyclopropanation(0)
- Epoxidation(0)
- Epoxide Ring Opening(0)
- Syn Vicinal Dihydroxylation(0)
- Weak Oxidative Cleavage(0)
- Ozonolysis Full Mechanism(0)
- Oxidative Cleavage(0)
- Alkyne Oxidative Cleavage(0)
- Alkyne Hydrohalogenation(0)
- Alkyne Halogenation(0)
- Alkyne Hydration(0)
- Alkyne Hydroboration(0)
- 11. Radical Reactions(0)
- 12. Alcohols, Ethers, Epoxides and Thiols(0)
- Alcohol Nomenclature(0)
- Ether Nomenclature(0)
- Epoxide Nomenclature(0)
- Thiol and Sulfide Nomenclature(0)
- Synthesis of Alcohols Overview(0)
- Leaving Group Conversions - Using HX(0)
- Leaving Group Conversions - SOCl2 and PBr3(0)
- Leaving Group Conversions - Sulfonyl Chlorides(0)
- Leaving Group Conversions Summary(0)
- Williamson Ether Synthesis(0)
- Making Ethers - Alcohol Condensation(0)
- Making Ethers - Alkoxymercuration(0)
- Making Ethers - Acid-Catalyzed Alkoxylation(0)
- Making Ethers - Cumulative Practice(0)
- Cleavage of Ethers(0)
- Alcohol Protecting Groups(0)
- t-Butyl Ether Protecting Groups(0)
- Silyl Ether Protecting Groups(0)
- Sharpless Asymmetric Epoxidation(0)
- Reactions of Thiols(0)
- Oxidation of Sulfides(0)
- 13. Alcohols and Carbonyl Compounds(0)
- 14. Synthetic Techniques(0)
- 15. Analytical Techniques: IR, NMR, Mass Spect(0)
- Purpose of Analytical Techniques(0)
- Infrared Spectroscopy(0)
- IR Spectroscopy - Frequencies(0)
- IR Spect: Drawing Spectra(0)
- IR Spect: Extra Practice(0)
- 1H Nuclear Magnetic Resonance - General Features(0)
- 1H NMR - Total Number of Signals(0)
- 1H NMR - Proton Relationships(0)
- 1H NMR: E/Z Diastereoisomerism(0)
- 1H NMR - Chemical Shifts(0)
- 1H NMR - Spin-Splitting without J-Values(0)
- 1H NMR: Spin-Splitting Simple Tree Diagrams(0)
- 1H NMR: Spin-Splitting Complex Tree Diagrams(0)
- 1H NMR Spin-Splitting - Common Patterns(0)
- 1H NMR - Integration(0)
- NMR Practice(0)
- 13C NMR - General Features(0)
- Structure Determination - Molecular Sentences(0)
- Mass Spect - Introduction(0)
- Mass Spect - Fragmentation(0)
- Mass Spect - Common Isotopes(0)
- 16. Conjugated Systems(0)
- Introduction to Conjugation(0)
- Stability of Conjugated Intermediates(0)
- Allylic Halogenation(0)
- Reactions at the Allylic Position(0)
- Conjugated Hydrohalogenation(0)
- Diels-Alder Reaction - General Features(0)
- Diels-Alder - Bridged Products(0)
- Diels-Alder Retrosynthesis(0)
- Basics of Molecular Orbital Theory(0)
- Drawing Atomic Orbitals(0)
- Drawing Molecular Orbitals(0)
- Frontier Molecular Orbital Theory - Finding HOMO/LUMO(0)
- Orbital Diagram:3-atoms- Allylic Ions(0)
- Orbital Diagram:4-atoms- 1,3-butadiene(0)
- Orbital Diagram:5-atoms- Allylic Ions(0)
- Orbital Diagram:6-atoms- 1,3,5-hexatriene(0)
- Orbital Diagram:Excited States(0)
- Intro to Pericyclic Reactions(0)
- Thermal Cycloaddition Reactions(0)
- Photochemical Cycloaddition Reactions(0)
- Thermal Electrocyclic Reactions(0)
- Photochemical Electrocyclic Reactions(0)
- Cumulative Electrocyclic Reactions(0)
- Introduction to Sigmatropic Shifts(0)
- Cope Rearrangement(0)
- Claisen Rearrangement(0)
- 17. Ultraviolet Spectroscopy(0)
- 18. Aromaticity(0)
- Aromaticity - Introduction(0)
- Four Tests of Aromaticity(0)
- Counting Pi Electrons(0)
- Aromaticity of Hydrocarbons(0)
- Aromaticity of Annulene(0)
- Aromaticity of Heterocycles(0)
- Inscribed Polygon Method(0)
- Benzene Nomenclature(0)
- Acidity of Aromatic Hydrocarbons(0)
- Basicity of Aromatic Heterocycles(0)
- Ionization of Aromatics(0)
- 19. Reactions of Aromatics: EAS and Beyond(0)
- Electrophilic Aromatic Substitution – General Mechanism(0)
- Electrophilic Aromatic Substitution – Reactions(0)
- Generating Electrophiles – EAS Halogenation(0)
- Generating Electrophiles – EAS Nitration(0)
- Generating Electrophiles – Friedel-Crafts Alkylation(0)
- Generating Electrophiles – Friedel-Crafts Acylation(0)
- Generating Electrophiles – Any Carbocation(0)
- EAS – Monosubstituted Benzene(0)
- EAS-o, p-Major Products(0)
- EAS – Protection of Aniline Derivatives(0)
- Limitations of Friedel-Crafts Alkyation(0)
- Advantages of Friedel-Crafts Acylation(0)
- Blocking Groups - Sulfonic Acid(0)
- EAS – Polysubstituted Benzene(0)
- Side-Chain Halogenation(0)
- Side-Chain Oxidation(0)
- Reactions at Benzylic Positions(0)
- Birch Reduction(0)
- EAS – Sequence Groups(0)
- EAS – Proposing Aromatic Synthesis(0)
- Diazonium Compounds – Replacements Reactions(0)
- Diazo Compounds – Sequence Groups(0)
- Diazonium Compounds – Proposing Aromatic Synthesis(0)
- SNAr Addition-Elimination Mechanism(0)
- Benzyne Pathway – General Mechanism(0)
- 20. Phenols(0)
- 21. Aldehydes and Ketones: Nucleophilic Addition(0)
- Aldehyde Nomenclature(0)
- Ketone Nomenclature(0)
- Intro to Redox(0)
- Oxidation(0)
- Weak Oxidative Cleavage(0)
- Aldehyde Via Reducing Agents(0)
- Alkyne Hydration(0)
- Nucleophilic Addition(0)
- Cyanohydrins(0)
- Organometallics(0)
- Nucleophilic Addition of Solvents(0)
- Hydrates(0)
- Hemiacetals(0)
- Acetals(0)
- Acetals as Protecting Groups(0)
- Thioacetals and Raney Nickel Reduction(0)
- Imines and Enamines(0)
- Addition of Ammonia Derivatives(0)
- Wolff Kishner Reduction(0)
- Baeyer-Villiger Oxidation(0)
- Ketones from Acid Chlorides(0)
- Ketones from Nitriles(0)
- Wittig Reaction(0)
- Ketone and Aldehyde Synthesis Reactions(0)
- 22. Carboxylic Acid Derivatives: NAS(0)
- COOH Derivatives and Nucleophilic Acyl Substitution(0)
- Carboxylic Acid Nomenclature(0)
- Diacid Nomenclature(0)
- Ester Nomenclature(0)
- Nitrile Nomenclature(0)
- Acid Chloride Nomenclature(0)
- Anhydride Nomenclature(0)
- Amide Nomenclature(0)
- Nucleophilic Acyl Substitution – The Three Rules(0)
- Specific Carboxylic Acid Conversions(0)
- Fischer Esterification – Mechanism(0)
- Acid-Catalyzed Ester Hydrolysis – Mechanism(0)
- Base-Catalyzed Ester Hydrolysis – Mechanism(0)
- Base-Catalyzed Transesterificaation – Mechanism(0)
- Lactones, Lactams and Cyclization Reactions(0)
- Carbonation of Grignard Reagents(0)
- Decarboxylation(0)
- Review of Nitriles(0)
- 23. The Chemistry of Thioesters, Phophate Ester and Phosphate Anhydrides(0)
- 24. Enolate Chemistry: Reactions at the Alpha-Carbon(0)
- Alpha Carbons and Tautomerization(0)
- Tautomers of Dicarbonyl Compounds(0)
- Enolates(0)
- Acid-Catalyzed Alpha-Halogenation(0)
- Base-Catalyzed Alpha-Halogenation(0)
- Haloform Reaction(0)
- Hell-Volhard-Zelinski Reaction(0)
- Overview of α-Carbon Alkylations and Acylations(0)
- Enolate Alkylation and Acylation(0)
- Enamine Alkylation and Acylation(0)
- Beta-Dicarbonyl Synthesis Pathway(0)
- Acetoacetic Ester Synthesis(0)
- Malonic Ester Synthesis(0)
- 25. Condensation Chemistry(0)
- 26. Amines(0)
- 27. Heterocycles(0)
- Nomenclature of Heterocycles(0)
- Acid-Base Properties of Nitrogen Heterocycles(0)
- Reactions of Pyrrole, Furan, and Thiophene(0)
- Directing Effects in Substituted Pyrroles, Furans, and Thiophenes(0)
- Addition Reactions of Furan(0)
- EAS Reactions of Pyridine(0)
- SNAr Reactions of Pyridine(0)
- Side-Chain Reactions of Substituted Pyridines(0)
- 28. Carbohydrates(0)
- Monosaccharide(0)
- Monosaccharides – D and L Isomerism(0)
- Monosaccharides – Drawing Fischer Projections(0)
- Monosaccharides – Common Structures(0)
- Monosaccharides – Forming Cyclic Hemiacetals(0)
- Monosaccharides – Cyclization(0)
- Monosaccharides – Haworth Projections(0)
- Monosaccharides – Mutarotation(0)
- Monosaccharides – Epimerization(0)
- Monosaccharides – Aldose-Ketose Rearrangement(0)
- Monosaccharides – Alkylation(0)
- Monosaccharides – Acylation(0)
- Monosaccharides – O-Glycosides(0)
- Monosaccharides – N-Glycosides(0)
- Monosaccharides – Reduction (Alditols)(0)
- Monosaccharides – Weak Oxidation (Aldonic Acid)(0)
- Monosaccharides – Reducing Sugars(0)
- Monosaccharides – Strong Oxidation (Aldaric Acid)(0)
- Monosaccharides – Oxidative Cleavage (Periodic Acid)(0)
- Monosaccharides – Osazones(0)
- Monosaccharides – Modern Kiliani-Fischer Synthesis(0)
- Monosaccharides – Wohl Degradation(0)
- Monosaccharides – Ruff Degradation(0)
- Condensation Into Disaccharide(0)
- Polysaccharides(0)
- 29. Amino Acids(0)
- Introduction to Proteins(0)
- Amino Acid Configuration(0)
- The 20 Amino Acids - Introduction(0)
- Amino Acid Chart(0)
- Acid-Base Properties of Amino Acids(0)
- Isoelectric Point(0)
- Amino Acid Synthesis: HVZ Method(0)
- Synthesis of Amino Acids: Acetamidomalonic Ester Synthesis(0)
- Synthesis of Amino Acids: N-Phthalimidomalonic Ester Synthesis(0)
- Synthesis of Amino Acids: Strecker Synthesis(0)
- Reactions of Amino Acids: Esterification(0)
- Reactions of Amino Acids: Acylation(0)
- Reactions of Amino Acids: Hydrogenolysis(0)
- Reactions of Amino Acids: Ninhydrin Test(0)
- 30. Peptides and Proteins(0)
- Peptides(0)
- Primary Protein Structure(0)
- Secondary Protein Structure(0)
- Tertiary Protein Structure(0)
- Disulfide Bonds(0)
- Quaternary Protein Structure(0)
- Summary of Protein Structure(0)
- Intro to Peptide Sequencing(0)
- Peptide Sequencing: Partial Hydrolysis(0)
- Peptide Sequencing: Partial Hydrolysis with Cyanogen Bromide(0)
- Peptide Sequencing: Edman Degradation(0)
- Merrifield Solid-Phase Peptide Synthesis(0)
- 31. Catalysis in Organic Reactions(0)
- 32. Lipids (0)
- 33. The Organic Chemistry of Metabolic Pathways(0)
- Intro to Metabolism(0)
- ATP and Energy(0)
- Intro to Coenzymes(0)
- Coenzymes in Metabolism(0)
- Energy Production in Biochemical Pathways(0)
- Intro to Glycolysis(0)
- Catabolism of Carbohydrates: Glycolysis(0)
- Glycolysis Summary(0)
- Pyruvate Oxidation (Simplified)(0)
- Anaerobic Respiration(0)
- Catabolism of Fats: Glycerol Metabolism(0)
- Intro to Citric Acid Cycle(0)
- Structures of the Citric Acid Cycle(0)
- The Citric Acid Cycle(0)
- 34. Nucleic Acids(0)
- 35. Transition Metals(0)
- Electron Configuration of Elements(0)
- Coordination Complexes(0)
- Ligands(0)
- Electron Counting(0)
- The 18 and 16 Electron Rule(0)
- Cross-Coupling General Reactions(0)
- Heck Reaction(0)
- Stille Reaction(0)
- Suzuki Reaction(0)
- Sonogashira Coupling Reaction(0)
- Fukuyama Coupling Reaction(0)
- Kumada Coupling Reaction(0)
- Negishi Coupling Reaction(0)
- Buchwald-Hartwig Amination Reaction(0)
- Eglinton Reaction(0)
- Catalytic Allylic Alkylation(0)
- Alkene Metathesis(0)
- 36. Synthetic Polymers(0)
- Introduction to Polymers(0)
- Chain-Growth Polymers(0)
- Radical Polymerization(0)
- Cationic Polymerization(0)
- Anionic Polymerization(0)
- Polymer Stereochemistry(0)
- Ziegler-Natta Polymerization(0)
- Copolymers(0)
- Step-Growth Polymers(0)
- Step-Growth Polymers: Urethane(0)
- Step-Growth Polymers: Polyurethane Mechanism(0)
- Step-Growth Polymers: Epoxy Resin(0)
- Polymers Structure and Properties(0)
11. Radical Reactions
Allylic Halogenation
11. Radical Reactions
Allylic Halogenation: Videos & Practice Problems
Allylic Halogenation practice problems
Status:
All




